
Originally Posted by
Peter
Well, Monday in the 'shed' has become Tuesday as I have a job to do Monday, seems Myself and James are the only two qualified CFMoto mechanics on the coast and James in on holiday for two weeks which either I come out of retirement, again at 75 or the Marbella Buggys fleet is down a couple.
"Just a throttle cable" he said, remove complete undertray, engine cover and front boot, crawl underneath and cut 10 zip ties to remove old one before threading new one along rest of cables and pipes and new zip ties then reassemble, It was then that I remembered one connects the front first then the throttle body as it is a pig to do the other way around. 3 hours.
Next was a CVT drive belt, 4 hours as the belt had exploded and wrapped itself around the cush drive spring, only 6600Km so strange, but after 7 hours none-stop, jobs done, just as the 16:00 two hour tour arrived back with another CVT belt problem, on the other new one, so on Monday back to do that, so the 'shed' is put back to Tuesday now. Just smile and think of the money as I soak in a hot Radox bath to relieve my aching muscles-
Having a pig of a job recoupling the shaft, first I bolted it onto the shifter upside down so the screw as underneath, no wonder I couldn't get it in. Then I dropped the darn thing into the tunnel a few times so getting stressed and the air was getting very blue so I went home. But, getting a lot done at last.